EDPN SERVICES & SYSTEM · CRITICAL POWER SYSTEMS · VIETNAM
PROJECTS & REFERENCES

PROJECTS & REFERENCES.

Selected projects and reference history across EDPN’s industry sectors.

REFERENCE EXPERIENCE

Browse by sector.

Choose a sector to go straight to its reference list.

EDPN SCOPEEDPN Scope of Work

Engineering · Supply · Replacement · Testing & Commissioning · Troubleshooting · Preventive Maintenance · Capacity Testing · Retrofit / Life Extension · Spare Parts.

SYSTEMSSystems / Equipment

Industrial AC UPS · DC UPS / Charger · Ni-Cd / VRLA Battery Systems · Monitoring · Inverter · Rectifier · Load Bank and test equipment.

CASE STUDIES

Selected project stories.

Projects that show the engineering, modernization and long-term service work behind the equipment.

EDPN engineer at the new Alcad Ni-Cd EDG starting battery, FPSO Thai Binh VN, 2013 — EDPN site photo
12 years serving CLJOC — contributing to its success to this day.
CLIENT CONFIRMATION LETTER

FPSO Thai Binh VN (IMO 9274381) — EDG Battery Upgrade

Oil & Gas · FPSO / EDG Starting System

After two operating incidents on the original EDG starting batteries, EDPN engineered and executed the change from 2 × 24 VDC VRLA to Alcad vented Ni-Cd.

2 VRLA incidents→Engineering review→Ni-Cd conversion→Replacement→T&C
REFERENCE HISTORY2013–2024
VIEW PROJECT →
EDPN engineer at the Alcad Ni-Cd battery on WHP-A — December 2014
12 years serving CLJOC — contributing to its success to this day.
CLIENT LETTER · ALCAD PUBLISHED

Su Tu Den South West Wellhead Platform (WHP-A) — Battery Technology Upgrade

Oil & Gas · Offshore WHP / Critical DC Battery

EDPN engineered and executed the replacement of the original VRLA battery system with Alcad Vantex Ni-Cd, including supply, replacement and Testing & Commissioning.

Original VRLA→Engineering review→Vantex Ni-Cd→Replacement→T&C
REFERENCE HISTORY2014
VIEW PROJECT →
Hoppecke vented battery at Uong Bi 330 MW — EDPN site survey, 2013
11 years serving Uong Bi Thermal Power Company — contributing to its success to this day.
UPS LIFE EXTENSION

Uong Bi Thermal Power Plant — UPS Life Extension

Utilities · Thermal Power Generation / AC UPS Life Extension

Life Extension of a legacy EXCOR APODYS2 UPS with CP70Z-generation electronics, touch-screen HMI, inverter-stage refurbishment and full functional testing.

Legacy APODYS2→Site survey→CP70Z upgrade→Refurbishment→Full testing
REFERENCE HISTORY2020–2023
VIEW PROJECT →
Alcad vented Ni-Cd battery bank at Phu My 2.2 BOT — EDPN site survey, 2015
10 years serving Mekong Energy — contributing to its success to this day.
5-YEAR FRAME CONTRACT

Phu My 2.2 BOT Power Plant — 5-Year Battery Service Frame Contract

Utilities · Power Generation / Battery Lifecycle Service

Five-year frame contract for battery service covering inspection, capacity testing, maintenance and reporting across vented lead-acid, VRLA and Ni-Cd systems.

Installed-base survey→Capacity testing→Maintenance→Reporting→Lifecycle support
REFERENCE HISTORY2016–2025
VIEW PROJECT →
Alcad Ni-Cd battery bank at Vedan Factory
13 years serving Vedan — contributing to Vedan’s success to this day.
LONG-TERM INDUSTRIAL PARTNER

Vedan Factory — Ni-Cd Battery & Critical-Power Lifecycle Support

Industrial · Process Manufacturing / Battery, Charger & UPS Lifecycle

Alcad Ni-Cd battery supply and service with capacity testing, a new Ni-Cd bank and charger in 2015, battery renewal with EDPN DC load-bank testing in 2017, and continuing charger and UPS support through 2023.

Ni-Cd supply→Capacity testing→Battery renewal→Charger & UPS→Lifecycle support
REFERENCE HISTORY2011–2023
VIEW PROJECT →
Chloride industrial UPS opened for preventive maintenance at Dung Quat Refinery — March 2016
10 years serving BSR — contributing to BSR’s success to this day.
REFINERY INSTALLED BASE

Dung Quat Refinery Factory — UPS & Battery Lifecycle Support

LNG & Petrochemical · Refinery / AC UPS, 110 VDC & Battery Lifecycle

Recurring support for 10 dual Chloride AC UPS and 13 dual 110 VDC chargers: battery capacity testing with EDPN DC load banks in 2016, battery supply and service, turnaround UPS service and spare parts through 2025.

Installed-base service→Capacity testing→Battery supply→Turnaround service→Lifecycle support
REFERENCE HISTORY2016–2025
VIEW PROJECT →
Cover of Saft's in-house magazine BästCeller, No. 1 · 2014 — EDPN on site measuring Alcad Ni-Cd cells
Cover: Saft BästCeller, No. 1 · 2014 · © Saft
RECOGNISED BY THE MANUFACTURER

Featured by Saft.

In December 2013 an Alcad (Saft) specialist came to Vietnam and, together with EDPN's service engineer, verified EDPN's work on site at the Petrolimex K132 depot.

The visit made the cover of Saft's in-house magazine BästCeller (No. 1 · 2014).

126references
8industry sectors
49sites with repeat engagements
44sites with installation & commissioning
Model, quantity and rating details are shared on request.REQUEST FULL REFERENCE LIST →
PROJECT REFERENCES

Reference list by sector.

Selected projects are shown here; full sector lists include 126 reference projects / assets.

01
OIL & GAS

Oil & Gas

Offshore production, FPSO, WHP, drilling and gas facilities.

PROJECT REFERENCE2019–2020

GALLAF1 (Gallaf Phase 1)

End UserNorth Oil Company
LocationOffshore, Qatar
VIEW PROJECT DETAIL →
EDPN engineer at the new Alcad Ni-Cd EDG starting battery, FPSO Thai Binh VN, 2013 — EDPN site photo
PROJECT REFERENCE2013–2024

FPSO Thai Binh VN (IMO 9274381)

End UserCuu Long Joint Operating Company
LocationOffshore
VIEW PROJECT DETAIL →
EDPN engineer at the Alcad Ni-Cd battery on WHP-A — December 2014
PROJECT REFERENCE2014

Su Tu Den South West Wellhead Platform (WHP-A)

End UserCuu Long Joint Operating Company
LocationOffshore
VIEW PROJECT DETAIL →
PROJECT REFERENCE2022–2024

Su Tu Den North East Wellhead Platform (WHP-B)

End UserCuu Long Joint Operating Company
LocationOffshore
VIEW PROJECT DETAIL →
New Ni-Cd cells for the PQP-HT and WHP-MT1 platforms — 2018
PROJECT REFERENCE2016–2019

PQP-HT Platform & WHP-MT1 Platforms

End UserBien Dong Petroleum Operating Company
LocationOffshore
VIEW PROJECT DETAIL →
PROJECT REFERENCE2025

Blocks 01&02

End UserPVN Blocks 01&02
LocationOffshore
02
LNG & PETROCHEMICAL

LNG & Petrochemical

Refinery, fertilizer and continuous-process applications.

Chloride industrial UPS opened for preventive maintenance at Dung Quat Refinery — March 2016
PROJECT REFERENCE2016–2025

Dung Quat Refinery Factory

End UserBinh Son Refining and Petrochemical JSC
LocationDung Quat
VIEW PROJECT DETAIL →
PROJECT REFERENCE2025

Phu My Fertilizer Plant

End UserPetroVietnam Fertilizer & Chemicals Corp. - Phu My Fertilizer Plant
LocationPhu My
VIEW PROJECT DETAIL →
PROJECT REFERENCE2014–2022

Nghi Son Refinery Factory

End UserNghi Son Refinery and Petrochemical LLC
LocationThanh Hoa
PROJECT REFERENCE2022–2024

Long Son Petrochemicals Complex

End UserLong Son Petrochemicals Company Limited
LocationBa Ria – Vung Tau
Alcad Ni-Cd battery banks at PVTEX — EDPN site survey, 2014
PROJECT REFERENCE2015

PVTEX Polyester Fiber Plant

End UserPV Petrochemical and Textile Fiber JSC
LocationHai Phong
VIEW PROJECT DETAIL →
03
UTILITIES

Utilities

Thermal power, hydropower and generation assets.

Alcad vented Ni-Cd battery bank at Phu My 2.2 BOT — EDPN site survey, 2015
PROJECT REFERENCE2016–2025

Phu My 2.2 BOT Power Plant

End UserMekong Energy Company Limited
LocationPhu My
VIEW PROJECT DETAIL →
Hoppecke vented battery at Uong Bi 330 MW — EDPN site survey, 2013
PROJECT REFERENCE2020–2023

Uong Bi Thermal Power Plant — 330 MW

End UserUong Bi Thermal Power Company (EVNGENCO1) - Uong Bi 330 MW
LocationUong Bi
VIEW PROJECT DETAIL →
220 VDC Hoppecke OPzV battery strings at Uong Bi 300 MW — EDPN site survey, 2012
PROJECT REFERENCE2013–2022

Uong Bi Thermal Power Plant — 300 MW

End UserUong Bi Thermal Power Company (EVNGENCO1) - Uong Bi 300 MW
LocationUong Bi
VIEW PROJECT DETAIL →
EDPN engineer checking electrolyte with a hydrometer during the GT24 / GT25 battery capacity test at Phu My 2.1MR, 2015
PROJECT REFERENCE2015–2024

Phu My 2.1MR Thermal Power Plant

End UserPower Generation Corporation 3
LocationPhu My
VIEW PROJECT DETAIL →
Original Alcad Ni-Cd battery bank before renewal, Phu My 1 Thermal Power Plant — EDPN condition survey, November 2013
PROJECT REFERENCE2013–2023

Phu My Thermal Power Complex (Phu My 1, 2.1, 4)

Condition surveys 2013–2015, then Alcad Ni-Cd battery renewal unit by unit (2017–2019).

End UserPower Generation Corporation 3
LocationPhu My
VIEW PROJECT DETAIL →
PROJECT REFERENCE2011–2022

Pha Lai Thermal Power Plant

End UserPha Lai Thermal Power JSC
LocationPha Lai
Before — original vented Ni-Cd battery with corroded, cracked cells at Ba Ria Thermal Power Plant, 2013 — EDPN site survey
BEFORE · 2013
After — new Alcad Ni-Cd battery installed by EDPN at Ba Ria Thermal Power Plant, 2014
AFTER · 2014
PROJECT REFERENCE · BEFORE & AFTER2013–2023

Ba Ria Thermal Power Plant

End UserBa Ria Thermal Power Plant
LocationBa Ria – Vung Tau
VIEW PROJECT DETAIL →
Original Alcad vented Ni-Cd battery before replacement, Da Mi Hydro Power Plant — EDPN site survey, February 2014
PROJECT REFERENCE2014

Da Mi Hydro Power Plant

Solution, supply and installation supervision: Alcad vented Ni-Cd replaced by Alcad Vantex maintenance-free Ni-Cd.

End UserDa Nhim – Ham Thuan – Da Mi Hydro Power JSC
LocationBinh Thuan
O Mon I Thermal Power Plant — EDPN site survey, 2018
PROJECT REFERENCE2022

O Mon I Thermal Power Plant

End UserCan Tho Thermal Power Company (EVNGENCO2) - O Mon I TPP
LocationCan Tho
VIEW PROJECT DETAIL →
PROJECT REFERENCE2013–2020

Vinh Tan 2 Thermal Power Plant

End UserPower Generation Corporation 3
LocationBinh Thuan
PROJECT REFERENCE2022–2025

Dai Ninh Hydro Power Plant

End UserDai Ninh Hydro Power Plant
LocationLam Dong
04
TRANSMISSION & DISTRIBUTION

Transmission & Distribution

Substation DC systems and grid infrastructure.

PROJECT REFERENCE2012–2024

Tuy Ha 110kV S/S

End UserUDICO-IDICO
LocationNhon Trach, Dong Nai
Voltage110kV
PROJECT REFERENCE2024

Ben Thanh 110kV S/S

End UserHo Chi Minh City Power Corporation
LocationHo Chi Minh City
Voltage110kV
PROJECT REFERENCE2016–2018

Toul Pongror 115kV S/S (GS8)

End UserElectricité du Cambodge
LocationCambodia
Voltage115kV
PROJECT REFERENCE2018–2024

Nha Trang 220kV S/S

End UserPower Transmission Company 3
LocationKhanh Hoa
Voltage220kV
PROJECT REFERENCE2014

Pho Noi 500kV S/S

End UserPower Transmission Company 1
LocationHung Yen
Voltage500kV
PROJECT REFERENCE2013

Vinh Tan 500kV S/S

End UserPower Transmission Company 3
LocationBinh Thuan
Voltage500kV
05
INDUSTRIAL

Industrial

Manufacturing, metals, glass and process-industry facilities.

Alcad Ni-Cd battery bank at Vedan Factory
INDUSTRIAL · LONG-TERM SUPPORT

Vedan Factory

UPS, charger and Ni-Cd battery supply and service across 2011–2023.

VIEW VEDAN FACTORY →
Alcad Ni-Cd battery bank at Vedan Factory
PROJECT REFERENCE2011–2023

Vedan Factory

End UserVedan Vietnam Enterprise Corp. Ltd
LocationDong Nai · Binh Phuoc
VIEW PROJECT DETAIL →
PROJECT REFERENCE2025

China Steel And Nippon Steel Vietnam — Steel Plant

End UserChina Steel And Nippon Steel Vietnam JSC
LocationVung Tau
PROJECT REFERENCE2023–2024

LEGO Factory

End UserLEGO Manufacturing Vietnam
LocationBinh Duong
VIEW PROJECT DETAIL →
PROJECT REFERENCE2013–2016

VOV Transmitting Stations

End UserVoice of Vietnam
LocationHanoi
Before — original GAZ vented Ni-Cd cells at Viglacera Float Glass Plant — EDPN site photo, 2015
BEFORE · GAZ
After — Alcad Ni-Cd cells at Viglacera Float Glass Plant — EDPN site photo, 2015
AFTER · ALCAD
PROJECT REFERENCE · BEFORE & AFTER2011–2020

Viglacera Float Glass Plant

End UserViglacera Float Glass Company
LocationBinh Duong
VIEW PROJECT DETAIL →
PROJECT REFERENCE2013–2014

ACE Insurance Office

End UserACE Limited - Chubb Limited
LocationHo Chi Minh City
06
TELECOMMUNICATION & DATA CENTER

Telecommunication & Data Center

DC power, rectifier, controller and battery applications.

PROJECT REFERENCE2021

VNPT-NET

End UserVNPT-NET
LocationDa Nang · Hai Phong · Ho Chi Minh City
PROJECT REFERENCE2022–2023

MobiFone Southern Data Centers

End UserMobiFone Telecommunications Corporation
LocationHo Chi Minh City · Binh Duong · Long An · Dong Nai · Ninh Thuan · Binh Thuan · Vung Tau
PROJECT REFERENCE2023–2024

MobiFone Da Nang Data Center

End UserMobiFone Telecommunications Corporation
LocationDa Nang
07
RAILWAY & TRANSPORTATION

Railway & Transportation

Airport, port and transportation infrastructure.

PROJECT REFERENCE2023

Noi Bai International Airport

End UserNoi Bai International Airport
LocationHanoi
VIEW PROJECT DETAIL →
PROJECT REFERENCE2023

Hanoi Metro Line 3 (Nhon – Hanoi Station)

End UserHanoi Metropolitan Railway Management Board
LocationHanoi
08
HEALTHCARE

Healthcare

Critical-power applications for healthcare facilities.

PROJECT REFERENCE2012

Hanoi Medical University Hospital

End UserHanoi Medical University Hospital
LocationHanoi
PROJECT REFERENCE2017–2023

Nam Sai Gon International General Hospital

End UserNam Sai Gon International General Hospital
LocationHo Chi Minh City
Astrid UPS and battery racks at Community Medical Center, Cambodia — EDPN site photo, 2010
PROJECT REFERENCE2010–2016

Community Medical Center

End UserCommunity Medical Center - Cambodia
LocationCambodia
Reference details reflect EDPN project history.

Photos are EDPN site photos unless labelled as illustrations.

PROJECT EXPERIENCE

Working on a similar application?

Send the project specification or installed-equipment details to EDPN.

VIEW FPSO THAI BINH VN →