Uong Bi Thermal Power Plant — 330 MW · UPS Life Extension
11 years serving Uong Bi Thermal Power Company — contributing to its success to this day.
Life Extension of an EXCOR APODYS2 UPS at Uong Bi 330MW Power Plant, combining electronics modernization, power-stage refurbishment and full functional testing.
← BACK TO PROJECTS & REFERENCES
From factory to Life Extension.
One installed base, followed through its life — who did what, and when.
Chloride APODYS2 UPS and UPS / inverter built for the 330 MW unit.
OEM · CHLORIDESystems in operation with the 330 MW unit (as-built February 2010).
PLANTEDPN site survey of the 220 VDC Hoppecke battery.
EDPNCapacity testing and recovery of the 220 VDC Hoppecke battery.
EDPNSpare parts and preventive maintenance for the UPS and UPS / inverter.
EDPNAPODYS2 → CP70Z-generation electronics, touch-screen HMI, full UPS test in December.
EDPNEXCOR APODYS2 upgraded with CP70Z-generation electronics and new HMI.
Life Extension engineering, site preparation, electronics modernization, inverter-stage refurbishment, component replacement, HMI upgrade and full UPS testing.
What the site needed.
The EXCOR APODYS2 UPS had been in operation since 2010 and required a structured Life Extension path rather than routine spare-parts replacement alone.
What EDPN delivered.
EDPN upgraded the legacy EXCOR APODYS2 platform to CP70Z-generation electronics with a color touch-screen HMI, refurbished the inverter stage, replaced key control and power components, and completed full UPS testing. EDPN also supplies spare parts and preventive maintenance for the 330 MW unit UPS and UPS / inverter, and carried out capacity testing and recovery of the 220 VDC Hoppecke vented lead-acid battery.
Project history.
EXCOR APODYS2 UPS put into operation.
EDPN site survey of the 220 VDC Hoppecke vented lead-acid battery (October 2013).
Capacity testing and recovery of the 220 VDC Hoppecke vented lead-acid battery.
Site survey and upgrade engineering for the legacy platform.
CP70Z-generation electronics, touch-screen HMI, inverter-stage refurbishment and critical component replacement.
Spare parts supply and preventive maintenance for the UPS and UPS / inverter of the 330 MW unit.
Full functional testing completed to confirm UPS operation and capability.
What followed.
The Life Extension work was completed with full functional testing of the upgraded UPS.
From the field.
220 VDC vented lead-acid battery of the 330 MW unit.
EDPN site photos, October 2013.




Tell us about the application.
For a new project, send the specification or load requirement. For service support, send the site, model, serial number, alarm or condition, and available maintenance history.