EDPN SERVICES & SYSTEM · CRITICAL POWER SYSTEMS · VIETNAM
PROJECT REFERENCE

Phu My 2.2 BOT Power Plant — 5-Year Battery Service Frame Contract

10 years serving Mekong Energy — contributing to its success to this day.

Battery service for a mixed installed base at Phu My 2.2 BOT Power Plant, covering vented lead-acid, VRLA and Ni-Cd systems.

SECTORUtilitiesAPPLICATIONPower Generation / Battery Lifecycle ServiceREFERENCE HISTORY2016–2025
← BACK TO PROJECTS & REFERENCES
Alcad vented Ni-Cd battery bank at Phu My 2.2 BOT — EDPN site survey, 2015
END USERMekong Energy Company LimitedSITE / PROJECTPhu My 2.2 BOT Power Plant
INSTALLED-BASE LIFECYCLE

From commercial operation to a 5-year battery programme.

One installed base, followed through its life — who did what, and when.

2005
Commercial operation

Phu My 2.2 BOT combined-cycle plant in commercial operation (February 2005).

PLANT
2015
Site survey

EDPN site survey of the Ni-Cd battery banks and chargers.

EDPN
2016
Battery service programme

EDPN capacity testing and maintenance across multiple battery technologies.

EDPN
2016–2025
Frame contract

Recurring battery service under a 5-year frame contract and beyond.

EDPN
Owner / plantEDPN
PROJECT

Five-year battery service framework covering a mixed installed base of lead-acid, VRLA and Ni-Cd systems.

Inspection, discharge/capacity testing, recharge, reporting and maintenance support across vented lead-acid, VRLA and Ni-Cd battery systems.

5-Year Frame ContractCapacity TestingMaintenanceTechnical Support
THE REQUIREMENT

What the site needed.

The plant operated multiple battery technologies and duty points across UPS, rectifier and station DC systems, requiring structured testing and condition assessment rather than generic maintenance.

EDPN SCOPE

What EDPN delivered.

EDPN provided battery inspection, discharge and recharge preparation, capacity testing, full recharge, handover and reporting. Technical documents reference IEC 60896-11 / IEEE 450, IEC 60896-21 / IEEE 1188 and IEC 60623 / IEEE 1106 according to battery technology.

PROJECT HISTORY

Project history.

2015
Site survey

EDPN site survey of the Ni-Cd battery banks and chargers (September 2015).

2016
Battery service program

Capacity testing and maintenance support across multiple battery technologies.

Frame-contract period
5-year service framework

Recurring battery service relationship for the installed base.

Through 2025
Continuing reference history

Battery, charger and lifecycle support continued beyond the initial service scope.

RESULT

What followed.

The relationship developed into a five-year frame contract for battery service, supporting a sustained installed-base service model rather than a one-off intervention.

2015 · SITE SURVEY

Ni-Cd battery banks and chargers before the service programme.

EDPN site photos, September 2015.

Alcad vented Ni-Cd cells (2015)
Alcad vented Ni-Cd cells (2015)
Corroded inter-cell connector (2015)
Corroded inter-cell connector (2015)
Ni-Cd battery bank on its stepped rack (2015)
Ni-Cd battery bank on its stepped rack (2015)
Battery charger cabinets (2015)
Battery charger cabinets (2015)
NEW PROJECT OR INSTALLED EQUIPMENT?

Tell us about the application.

For a new project, send the specification or load requirement. For service support, send the site, model, serial number, alarm or condition, and available maintenance history.

GET IN TOUCH →