PROJECT REFERENCE
Su Tu Den North East Wellhead Platform (WHP-B)
Installed-base support for an offshore wellhead platform.
← BACK TO PROJECTS & REFERENCESEND USERCuu Long Joint Operating CompanySITE / PROJECTSu Tu Den North East Wellhead Platform (WHP-B)
INSTALLED-BASE LIFECYCLE
From production start to installed-base support.
One installed base, followed through its life — who did what, and when.
2010
Production start
Su Tu Den North East in production from April 2010.
PLANT2022–2024
Installed-base support
EDPN troubleshooting and spare-parts support for the platform UPS.
EDPNOwner / plantEDPN
PROJECT
UPS troubleshooting and spare-parts support.
Troubleshooting and UPS spare-parts support for the WHP-B installed base.
TroubleshootingSpare Parts
THE REQUIREMENT
What the site needed.
UPS installed-base support requirement.
EDPN SCOPE
What EDPN delivered.
Troubleshooting and spare-parts support.
PROJECT HISTORY
Project history.
2022–2024
Installed-base support
Troubleshooting and spare-parts support.
RESULT
What followed.
Reference history across 2022–2024.
PROJECT PHOTOS
From the field.
NEW PROJECT OR INSTALLED EQUIPMENT?
Tell us about the application.
For a new project, send the specification or load requirement. For service support, send the site, model, serial number, alarm or condition, and available maintenance history.