Vedan Factory

13 years serving Vedan — contributing to Vedan’s success to this day.

Long-running industrial critical-power reference.

SECTORIndustrialAPPLICATIONProcess Manufacturing / Critical PowerREFERENCE HISTORY2011–2023
← BACK TO PROJECTS & REFERENCES
Alcad Ni-Cd battery bank at Vedan Factory
END USERVedan Vietnam Enterprise Corp. LtdSITE / PROJECTVedan Factory
INSTALLED-BASE LIFECYCLE

From plant start-up to lifecycle support.

One installed base, followed through its life — who did what, and when.

1991
Plant established

Vedan Vietnam established at Phuoc Thai, Dong Nai.

PLANT
2011–2012
Ni-Cd battery systems

EDPN supplied and serviced Alcad Ni-Cd battery systems, including capacity testing.

EDPN
2015
New Ni-Cd bank & charger

New Alcad Ni-Cd battery bank and charger on site (November 2015).

EDPN
2016–2021
Service & expansion

Battery service, charger supply, UPS supply and recurring technical support.

EDPN
2022–2023
UPS lifecycle support

Further UPS module supply and service.

EDPN
Owner / plantEDPN
PROJECT

Long-term critical-power support at Vedan Factory.

Supply and service for UPS, charger and Ni-Cd battery systems across a 2011–2023 reference history.

Supply & Service
THE REQUIREMENT

What the site needed.

Recurring UPS, charger and battery requirements across an industrial installed base.

EDPN SCOPE

What EDPN delivered.

Supply and service across UPS, charger and battery systems.

PROJECT HISTORY

Project history.

2011–2012
Ni-Cd battery systems

Supply and service for Alcad Ni-Cd battery systems, including capacity testing.

2015
New Ni-Cd battery bank & charger

New Alcad Ni-Cd battery bank and charger — first day on site, November 2015.

2016–2021
Installed-base service & expansion

Battery service, charger supply, UPS supply and recurring technical support.

2022–2023
UPS lifecycle support

Further UPS module supply and service for the Vedan installed base.

RESULT

What followed.

Reference history from 2011 through 2023.

PROJECT PHOTOS

From the field.

Vedan Factory project photo 1
Vedan Factory project photo 2
Vedan Factory project photo 3
2015 · FIRST DAYS ON SITE

The existing Ni-Cd system, then the new Alcad bank.

EDPN site photos, October and November 2015.

October 2015 — existing Hoppecke FNC Ni-Cd cells
October 2015 — existing Hoppecke FNC Ni-Cd cells
October 2015 — existing battery charger
October 2015 — existing battery charger
November 2015 — new Alcad Ni-Cd battery bank on a two-tier rack
November 2015 — new Alcad Ni-Cd battery bank on a two-tier rack
November 2015 — new battery charger cabinet
November 2015 — new battery charger cabinet
2017 · BEFORE / AFTER

From the original alkaline cells to a new Alcad Ni-Cd string.

EDPN site photos, March 2017 — before, and after with capacity testing by an EDPN DC load bank.

Before — original alkaline cells in the battery cabinet (2017)
Before — original alkaline cells in the battery cabinet (2017)
Before — corroded terminals and connectors (2017)
Before — corroded terminals and connectors (2017)
After — new Alcad Ni-Cd cells under capacity test (2017)
After — new Alcad Ni-Cd cells under capacity test (2017)
After — EDPN DC load bank running the capacity test (2017)
After — EDPN DC load bank running the capacity test (2017)