EDPN SERVICES & SYSTEM · CRITICAL POWER SYSTEMS · VIETNAM
PROJECT REFERENCE

Phu My Fertilizer Plant

Continuous-process UPS reference.

SECTORLNG & PetrochemicalAPPLICATIONFertilizer / Process IndustryREFERENCE HISTORY2025
← BACK TO PROJECTS & REFERENCES
END USERPetroVietnam Fertilizer & Chemicals Corp. - Phu My Fertilizer PlantSITE / PROJECTPhu My Fertilizer Plant
INSTALLED-BASE LIFECYCLE

From plant start-up to UPS renewal.

One installed base, followed through its life — who did what, and when.

2004
Plant in operation

Phu My Fertilizer Plant handed over for operation (September 2004).

PLANT
2011
Site survey

EDPN site survey of the battery systems.

EDPN
2025
UPS supply & service

EDPN supplied and serviced one dual industrial UPS system.

EDPN
Owner / plantEDPN
PROJECT

Dual UPS supply and service.

Supply and service for one dual industrial UPS system.

Supply & Service
THE REQUIREMENT

What the site needed.

Industrial AC continuity for process plant duty.

EDPN SCOPE

What EDPN delivered.

Dual UPS supply and service.

PROJECT HISTORY

Project history.

2011
Site survey

EDPN site survey of the battery systems (March 2011).

2025
Project execution

Dual UPS supply and service.

RESULT

What followed.

2025 reference.

2011 · SITE SURVEY

Battery system survey.

EDPN site photos, March 2011.

FIAMM battery bank (2011)
FIAMM battery bank (2011)
Battery cell terminals (2011)
Battery cell terminals (2011)
NEW PROJECT OR INSTALLED EQUIPMENT?

Tell us about the application.

For a new project, send the specification or load requirement. For service support, send the site, model, serial number, alarm or condition, and available maintenance history.

GET IN TOUCH →