Su Tu Den South West Wellhead Platform (WHP-A) — Battery Technology Upgrade
12 years serving CLJOC — contributing to its success to this day.
Battery-system upgrade for CLJOC WHP-A, replacing the original VRLA installation with Alcad Vantex Ni-Cd in 2014.
← BACK TO PROJECTS & REFERENCES
From first oil to a Ni-Cd upgrade.
One installed base, followed through its life — who did what, and when.
Su Tu Den field first oil (October 2003) — South West wellhead platform in production.
PLANTEDPN replaced the original VRLA system with Alcad Vantex Ni-Cd, including supply, replacement and T&C.
EDPNReplacement of the original VRLA battery system with Alcad Vantex Ni-Cd for offshore critical duty.
Engineering · Supply · Replacement · T&C for an Alcad Vantex maintenance-free Ni-Cd battery replacing the original VRLA system.
What the site needed.
The offshore platform required replacement of the original VRLA battery system with a solution suited to the critical duty and site conditions.
What EDPN delivered.
EDPN engineered and executed the change from the original VRLA system to Alcad Vantex maintenance-free Ni-Cd, including supply, replacement and Testing & Commissioning.
Project history.
Review of the original VRLA system and required critical offshore duty.
Selected an Alcad Vantex maintenance-free Ni-Cd solution.
EDPN executed replacement and Testing & Commissioning.
The upgraded Ni-Cd system has remained with the client since 2014.
What followed.
The upgraded Ni-Cd system has remained with the client since 2014.
From the field.
The upgraded battery in service offshore.
EDPN site photos, December 2014.