EDPN SERVICES & SYSTEM · CRITICAL POWER SYSTEMS · VIETNAM
PROJECT REFERENCE

FPSO Thai Binh VN (IMO 9274381) — EDG Battery Upgrade

12 years serving CLJOC — contributing to its success to this day.

EDG starting-battery upgrade for FPSO Thai Binh VN (IMO 9274381), converting the original VRLA arrangement to Alcad vented Ni-Cd after two operating incidents.

SECTOROil & GasAPPLICATIONFPSO / EDG Starting SystemREFERENCE HISTORY2013–2024
← BACK TO PROJECTS & REFERENCES
EDPN engineer at the new Alcad Ni-Cd EDG starting battery, FPSO Thai Binh VN, 2013 — EDPN site photo
END USERCuu Long Joint Operating CompanySITE / PROJECTFPSO Thai Binh VN (IMO 9274381)
INSTALLED-BASE LIFECYCLE

From FPSO start-up to a safer EDG start.

One installed base, followed through its life — who did what, and when.

2008
FPSO in service

FPSO Thai Binh VN in service in Block 15-1, Cuu Long Basin, with 2 × 24 VDC VRLA EDG starting batteries.

PLANT
2013
Engineering conversion

EDPN engineered the move to Alcad vented Ni-Cd after two EDG-start incidents.

EDPN
2013
Supply · replacement · T&C

New Ni-Cd starting battery supplied, installed and tested for handover.

EDPN
2024
Ongoing support

Critical-power support for the FPSO continues.

EDPN
Owner / plantEDPN
PROJECT

EDG starting-battery upgrade following two incidents on the original VRLA system.

Engineering · Supply · Replacement · T&C for the EDG starting battery, converting the original VRLA arrangement to Alcad vented Ni-Cd.

EngineeringSupplyReplacementTesting & Commissioning
THE REQUIREMENT

What the site needed.

The original EDG starting battery arrangement used 2 × 24 VDC VRLA batteries and had experienced two operational incidents.

EDPN SCOPE

What EDPN delivered.

EDPN engineered the battery-technology change, supplied the new system, executed replacement and completed Testing & Commissioning for an Alcad vented Ni-Cd arrangement.

PROJECT HISTORY

Project history.

Pre-2013
Original VRLA arrangement

2 × 24 VDC VRLA EDG starting-battery arrangement; two incidents prompted technical intervention.

2013
Engineering conversion

EDPN engineered the move to Alcad vented Ni-Cd for the EDG starting application.

2013
Supply · Replacement · T&C

New battery system supplied, installed/replaced and tested for handover.

Since 2013
Lifecycle reference

Client continues with the solution; later TBVN records also show ongoing critical-power support.

RESULT

What followed.

The upgraded battery system has remained part of the client installation since 2013, with continuing EDPN support on the TBVN installed base.

2013 · NI-CD CONVERSION

New Alcad starting battery at the EDG.

EDPN site photos, 2013.

EDPN engineer with the new Alcad Ni-Cd starting battery at the EDG (2013)
EDPN engineer with the new Alcad Ni-Cd starting battery at the EDG (2013)
Ni-Cd starting battery installed beside the emergency diesel generator (2013)
Ni-Cd starting battery installed beside the emergency diesel generator (2013)
Alcad Ni-Cd cells on the EDG battery rack (2013)
Alcad Ni-Cd cells on the EDG battery rack (2013)
Alcad vented Ni-Cd cell (2013)
Alcad vented Ni-Cd cell (2013)