O Mon I Thermal Power Plant — BACS Battery Monitoring

Battery monitoring reference for the station DC batteries of O Mon I Thermal Power Plant (2 × 330 MW), operated by Can Tho Thermal Power Company (EVNGENCO2).

SECTORUtilitiesAPPLICATIONThermal Power Generation / Station DC Battery MonitoringREFERENCE HISTORY2022
← BACK TO PROJECTS & REFERENCES
O Mon I Thermal Power Plant — EDPN site survey, December 2018
END USERCan Tho Thermal Power Company (EVNGENCO2) - O Mon I TPPSITE / PROJECTO Mon I Thermal Power Plant (2 × 330 MW), O Mon Power Center, Can Tho
INSTALLED-BASE LIFECYCLE

From plant start-up to battery monitoring.

One installed base, followed through its life — who did what, and when.

2009
Unit S1 in operation

First 330 MW unit of O Mon I in operation.

PLANT
2015
Unit S2 in operation

Second 330 MW unit in operation.

PLANT
2018
Site survey

EDPN survey of the 110 VDC battery rooms and chargers.

EDPN
2021
Pre-BACS survey

EDPN survey of the station battery rooms before the BACS retrofit.

EDPN
2022
BACS supply & service

2 × GENEREX BACS for the 110 VDC station batteries, integrated with the plant DCS.

EDPN
Plant milestoneEDPN
PROJECT

GENEREX BACS battery monitoring for the station DC batteries, integrated with the plant DCS.

Supply and service of two GENEREX BACS battery monitoring systems for the 110 VDC station batteries of O Mon I TPP S1 & S2, integrated with the plant DCS.

Supply & Service
THE REQUIREMENT

What the site needed.

Station DC batteries support the plant's control, protection and emergency loads. A hidden defect in a single battery may only show itself when the batteries are called on.

EDPN SCOPE

What EDPN delivered.

EDPN supplied and serviced two GENEREX BACS battery monitoring systems for the 110 VDC station batteries — one for the Hoppecke OPzV batteries and one for the FIAMM OPzV gel batteries. Monitoring data are integrated into the plant DCS.

PROJECT HISTORY

Project history.

2018
Site survey

EDPN site survey of the 110 VDC battery rooms and chargers (December 2018).

2021
Site survey before BACS

EDPN survey of the station battery rooms before the BACS retrofit (March 2021).

2022
Supply & service

Two GENEREX BACS systems for the 110 VDC station batteries, with DCS integration.

RESULT

What followed.

As published by GENEREX, BACS cyclically checks the voltage, temperature and internal resistance of each individual battery, balances charging voltage, detects hidden battery defects, issues configurable alarms and helps maximise battery service life.

2018 · SITE SURVEY

110 VDC battery rooms and chargers.

EDPN site photos, December 2018.

O Mon I Thermal Power Plant (2018)
O Mon I Thermal Power Plant (2018)
FIAMM OPzV gel battery strings (2018)
FIAMM OPzV gel battery strings (2018)
110 VDC charger display (2018)
110 VDC charger display (2018)
BACS RETROFIT · BEFORE INSTALLATION

Station battery rooms before BACS.

EDPN site survey, March 2021 — no cell monitoring fitted yet.

Hoppecke OPzV battery room — before BACS (2021)
Hoppecke OPzV battery room — before BACS (2021)
Hoppecke cell terminals — no monitoring modules (2021)
Hoppecke cell terminals — no monitoring modules (2021)
FIAMM OPzV gel battery room — before BACS (2021)
FIAMM OPzV gel battery room — before BACS (2021)
FIAMM OPzV gel cell tops — no monitoring modules (2021)
FIAMM OPzV gel cell tops — no monitoring modules (2021)
NEW PROJECT OR INSTALLED EQUIPMENT?

Tell us about the application.

For a new project, send the specification or load requirement. For service support, send the site, model, serial number, alarm or condition, and available maintenance history.