From site survey to battery renewal.
One installed base, followed through its life — who did what, and when.
Original UPS and vented Ni-Cd battery surveyed by EDPN.
EDPNAstrid industrial UPS and Alcad Ni-Cd battery supplied and serviced.
EDPNFurther Alcad Ni-Cd battery supplied.
EDPNFurther Alcad Ni-Cd battery supplied.
EDPNAstrid industrial UPS and Alcad vented Ni-Cd battery, replacing the original UPS and battery.
As the then representative of Astrid (Italy) in Vietnam, EDPN engineered, supplied, replaced, installed, tested and commissioned an Astrid industrial UPS and an Alcad vented Ni-Cd battery with an EDPN battery rack and battery switchfuse (2014), followed by further Alcad Ni-Cd batteries in 2020 and 2023.
What the site needed.
EDPN's site survey in November 2013 found the original UPS and its vented Ni-Cd battery at the end of their service life, with corroded and cracked cell containers.
What EDPN delivered.
As the then representative of Astrid (Italy) in Vietnam, EDPN carried out the engineering, supply, replacement, installation, testing and commissioning of an Astrid industrial UPS and an Alcad vented Ni-Cd battery, with an EDPN battery rack and battery switchfuse for the new bank (2014). EDPN later supplied further Alcad Ni-Cd batteries in 2020 and 2023.
Project history.
EDPN site survey of the original UPS and vented Ni-Cd battery (November 2013).
Engineering, supply, replacement, installation, testing and commissioning: Astrid industrial UPS and Alcad Ni-Cd, with EDPN battery rack and battery switchfuse (October 2014).
Further Alcad Ni-Cd battery supplied.
Further Alcad Ni-Cd battery supplied.
What followed.
New industrial UPS and Ni-Cd battery in service since 2014, with further Alcad battery supply in 2020 and 2023.
From the field.
Before and after the replacement.
EDPN site photos: survey November 2013, replacement October 2014.




Astrid UPS and Alcad Ni-Cd battery.
EDPN site photos, October 2014.